Display Tender DEW049737
This page displays the details of a tender. See the detailed help in each section for specific information.
Enquiries
- Joe Mammone
- Office: +61 (08) 8463 3739
- Mobile: 0428 116 548
- [email protected]
- Peter Down
- Technical
- Mobile: +61 (04) 28109087
- [email protected]
Description
Contract No. 1979
DEW is implementing the South Australian Riverland Floodplains Integrated Infrastructure Program (SARFIIP).
The aim of the SARFIIP is to create an interconnected mosaic of manageable floodplains and wetlands between Lock 1 and the South Australian Borders with New South Wales and Victoria. SARFIIP aims to simulate high river flow floodplain flooding at low river flows by taking advantage of increased water levels through the raising of water levels at weirs along the River Murray. The increased flooding frequency enabled by these works is intended to enhance ecological health within major sections of the floodplain and wetlands.
The Environmental Pathways Project, a subproject of SARFIIP, has identified a suite of sites to improve connectivity between the River Murray and its floodplains. This specification is for the construction of two new water regulating structures at Qualco wetland.
A specification has been prepared outlining the requirements at Akuna, Molo Flat and Qualco sites.
This tender is for the delivery of requirements at Qualco site only.
-
Request for Tender Qualco
- Version 1 (23 July 2021)
- Available by Download (134 KB)
-
Specification Qualco Only
- Version 1 (23 July 2021)
- Available by Download (154 KB)
-
Qualco Contract
- Version 1 (23 July 2021)
- Available by Download (253 KB)
-
Site Inspection
- Version 1 (23 July 2021)
- Available by Download (277 KB)
-
20200307DW001-009RevB Cover and Notes
- Version 1 (23 July 2021)
- Available by Download (3 MB)
-
20200307DW100-108RevC Qualco Q1A
- Version 1 (23 July 2021)
- Available by Download (7 MB)
-
20200307DW121-134RevD Qualco Q1B
- Version 1 (23 July 2021)
- Available by Download (6 MB)
-
20200307DW150-158RevB Qualco Q1A Access Track
- Version 1 (23 July 2021)
- Available by Download (1 MB)
-
Appendix_C_Qualco_Geotech
- Version 1 (23 July 2021)
- Available by Download (2 MB)
-
Appendix_E_Contractor Safety Procedure
- Version 1 (23 July 2021)
- Available by Download (1 MB)