JavaScript Disabled

This site requires JavaScript Enabled to function properly. Please enable JavaScript or use a different browser that has JavaScript enabled.

SA Tenders and Contracts

Display Tender BHKC046687 
This page displays the details of a tender. See the detailed help in each section for specific information.

Construction of the Area 1 Everard Park Culvert Upgrade
Issued By Brown Hill and Keswick Creeks Stormwater Board
Request for Tender
Tender State
Awarded
Tender Code
BHKC046687
Contract Number
411-20-1
Category
Drainage system construction service

Enquiries 

Contacts

Description 

The Brown Hill Keswick Creek Stormwater Project is a collaborative undertaking between the Cities of Adelaide, Burnside, Mitcham, Unley and West Torrens.

Upper Brown Hill Creek comprises 7km of creek located upstream of Anzac Highway to its source in Mitcham.  Flood mitigation works in Upper Brown Hill Creek involve increasing the capacity of approximately 1.9km of creek along with the upgrade of specific creek choke points including public and private bridges.

Design plans have been finalised for the section of Upper Brown Hill Creek between Anzac Highway, Everard Park and Third Avenue, Forestville.  This section has a length of approximately 140 metres and the existing open channel is to be replaced by an underground covered culvert that is of sufficient size to accommodate the level of stormwater that would otherwise result in flooding in the instance of a 1 in 100 year flood event. 

The Board is responsible for delivery of the covered culvert and, thereafter, the City of Unley will be responsible for delivery of the shared use pathway and associated works at ground level. 

Specification Documents 

You must be logged in to download documents.
  • RFT Section D - Tender Response Schedules Area 1   
    • Version 1 (13/02/2020)
    • Available by Download   (93 KB)
  • RFT Section D - Annexure B Schedule of Prices   
    • Version 1 (13/02/2020)
    • Available by Download   (41 KB)
  • Tecnical Specification WGA189442-SP-CV-0001[B]   
    • Version 1 (13/02/2020)
    • Available by Download   (2 MB)
  • WGA189442-COMBINED CIVIL SET   
    • Version 1 (13/02/2020)
    • Available by Download   (5 MB)
  • WGA189442-DR-Combined (Tender Update)   
    • Version 1 (13/02/2020)
    • Available by Download   (2 MB)
  • General Specification   
    • Version 1 (13/02/2020)
    • Available by Download   (200 KB)
  • General Specification Appendix A Brown Hill Creek casting comparison REV PER DEL SCHEDULE REVB   
    • Version 1 (13/02/2020)
    • Available by Download   (104 KB)
  • General Specification Appendix B Arborist Report   
    • Version 1 (13/02/2020)
    • Available by Download   (2 MB)
  • General Specification Appendix D Land Acquisition Plan   
    • Version 1 (13/02/2020)
    • Available by Download   (360 KB)
  • Special Conditions of Contract AS2124   
    • Version 1 (13/02/2020)
    • Available by Download   (96 KB)
  • RFT Construction Works Area 1   
    • Version 1 (13/02/2020)
    • Available by Download   (225 KB)
  • Site Briefing Clarifications   
    • Version 1 (25/02/2020)
    • Available by Download   (21 KB)
  • Q1a - ECM_906037_v1_20080100_SHT12_A pdf   
    • Version 1 (25/02/2020)
    • Available by Download   (408 KB)
  • Q1b - ECM_906038_v1_20080100_SHT10_A pdf   
    • Version 1 (25/02/2020)
    • Available by Download   (206 KB)
  • Q1c - ECM_906039_v1_20080100_SHT11_A pdf   
    • Version 1 (25/02/2020)
    • Available by Download   (394 KB)
  • Q1d - ECM_906040_v1_20080100SA1 pdf   
    • Version 1 (25/02/2020)
    • Available by Download   (327 KB)
  • Q3 - ADL189442-X-DESIGN   
    • Version 1 (25/02/2020)
    • Available by Download   (1 MB)
  • Q5 - Lot 104 Laydown Area   
    • Version 1 (25/02/2020)
    • Available by Download   (339 KB)
  • Q6 - ADL189442-X-DESIGN-Model   
    • Version 1 (25/02/2020)
    • Available by Download   (196 KB)
  • Q14 - 24624BC01-A_WGA REVIEW 20.01.31   
    • Version 1 (25/02/2020)
    • Available by Download   (1 MB)
  • Q16 - Brown Hill Creek casting comparison REV PER INVERTED DELIVERY - CU15 TO CU7 (1)   
    • Version 1 (25/02/2020)
    • Available by Download   (161 KB)
  • Site Briefing Clarifications 2   
    • Version 1 (02/03/2020)
    • Available by Download   (24 KB)
  • General Specification Appendix B Arborist Report -V2   
    • Version 1 (02/03/2020)
    • Available by Download   (2 MB)
  • (A19016) Signed WAA Permit and letter   
    • Version 1 (02/03/2020)
    • Available by Download   (699 KB)
  • Brown Hill Creek casting comparison REV PER INVERTED DELIVERY - CU15 TO CU7 - REVB (1)   
    • Version 1 (02/03/2020)
    • Available by Download   (161 KB)
  • Site Briefing Clarifications 3   
    • Version 1 (04/03/2020)
    • Available by Download   (24 KB)
  • Pricing Schedule Overheads   
    • Version 1 (04/03/2020)
    • Available by Download   (107 KB)