Display Tender COM051323
This page displays the details of a tender. See the detailed help in each section for specific information.
Enquiries
Contacts
- Malcolm Eagles
- [email protected]
Description
The procurement is for 5 separate Portions of Works. Council reserves the right to award the various Portions to different Contractors, or all Portions to a single Contractor. Tenderers can be a single company with subcontractors, a joint venture, and the like.
Portion 1 - Design and Construct - Seacliff pipeline extension.
Portion 2 - Construction - New aquifer storage and recovery well at Oaklands Wetlands
Portion 3 - Design and Construct - Pipeline extension to Flinders University and Women's Memorial Playing Fields
Portion 4 - Design and Construct - Chlorination dosing system at Oaklands Wetlands
Portion 5 - Design and Construct - Stage 1 :Tank, compound and irrigation pumps, and Stage 2: transfer pipeline. Both for Marion Golf Course.
NOTE: The Pricing Schedule is provided in Excel, there is a separate sheet (or tab) for each of the five Portions within the single Excel file. Pricing is to be submitted in Excel.
-
CC2022033 Information for Tenderers
- Version 1 (9 May 2022)
- Available by Download (585 KB)
-
CC2022033 Part A Conditions of Tendering
- Version 1 (9 May 2022)
- Available by Download (369 KB)
-
CC2022033 Part B Specification
- Version 1 (9 May 2022)
- Available by Download (918 KB)
-
CC2022033 Part C Conditions of Contract
- Version 1 (9 May 2022)
- Available by Download (1 MB)
-
CC2022033 Part D Response Schedules
- Version 1 (9 May 2022)
- Available by Download (402 KB)
-
CC2022033 Part D Schedule 19 - Pricing
- Version 1 (9 May 2022)
- Available by Download (42 KB)
-
Appendix 1 Oaklands Seacliff Concept Design Report.
- Version 1 (9 May 2022)
- Available by Download (9 MB)
-
Appendix 2 Part A 11739-2-M03-0 on site pipes
- Version 1 (9 May 2022)
- Available by Download (916 KB)
-
Appendix 2 Part B Well Enclosure details
- Version 1 (9 May 2022)
- Available by Download (996 KB)
-
Appendix 2 Part C Spec-MechElec Original
- Version 1 (9 May 2022)
- Available by Download (514 KB)
-
Appendix 2 Part D Power Distribution Details
- Version 1 (9 May 2022)
- Available by Download (526 KB)
-
Appendix 2 Part F Common Service Trench details
- Version 1 (9 May 2022)
- Available by Download (723 KB)
-
Appendix 2 Part E ASR Bore profile details
- Version 1 (9 May 2022)
- Available by Download (381 KB)
-
Appendix 2 Part G ASR General Well Head Details
- Version 1 (9 May 2022)
- Available by Download (507 KB)
-
Appendix 2 Part H Tree Protection Zone Details
- Version 1 (9 May 2022)
- Available by Download (1 MB)
-
Appendix 2 Part I Electrical drawing
- Version 1 (9 May 2022)
- Available by Download (525 KB)
-
Appendix 2 Part J Well Permit ASR 5 Oaklands Wetlands
- Version 1 (9 May 2022)
- Available by Download (7 MB)
-
Appendix 3 Part A Tonsley Recycled Water Network Pipe Alignment_Optimized
- Version 1 (9 May 2022)
- Available by Download (3 MB)
-
Appendix 3 Part B KBR Water Balance Report
- Version 1 (9 May 2022)
- Available by Download (5 MB)
-
Appendix 3 Part C South Road ASBUILT 190406
- Version 1 (9 May 2022)
- Available by Download (409 KB)
-
Appendix 4 Part A New Buffer Storage Tank
- Version 1 (9 May 2022)
- Available by Download (415 KB)
-
Appendix 4 Part B Exixting site layout sectional details
- Version 1 (9 May 2022)
- Available by Download (361 KB)
-
Appendix 4 Part C Existing Site layout plan section
- Version 1 (9 May 2022)
- Available by Download (384 KB)
-
Appendix 4 Part D Existing Site layout plan section 2
- Version 1 (9 May 2022)
- Available by Download (544 KB)
-
Appendix 4 Part F Proposed location of Dosing Equipment and Chemical Storage
- Version 1 (9 May 2022)
- Available by Download (937 KB)
-
Appendix 4 Part G Sodium Hypochlorite (10 to 15 percent) - SDS Mar 2019
- Version 1 (9 May 2022)
- Available by Download (507 KB)
-
Appendix 4 Part H Lowara Model 66SV4N 22kw 316SS
- Version 1 (9 May 2022)
- Available by Download (1 MB)
-
Appendix 4 Part E Polymaster Chemical Dosing system
- Version 1 (9 May 2022)
- Available by Download (2 MB)
-
Appendix 5 Part A Tank Location for Stage 1 Works Golf Club
- Version 1 (9 May 2022)
- Available by Download (274 KB)
-
Appendix 5 Part B Drawings for Low and High Prrssure Pump Set
- Version 1 (9 May 2022)
- Available by Download (9 MB)
-
Appendix 5 Part C Irrigation Technical Specification for MARION Golf Course
- Version 1 (9 May 2022)
- Available by Download (421 KB)
-
Appendix 5 Part D Existing Route of main line to Golf Club lower tank
- Version 1 (9 May 2022)
- Available by Download (352 KB)
Briefings
A briefing session will be held at Oaklands Education Centre at Oaklands Wetlands, 237 Oaklands Road, Oaklands Park, City of Marion, SA, Australia, 5046 on 10:00 am 24 May 2022.
Notes: Meet at Education Centre at 10am for briefing, then visit key sites, using own transport.