JavaScript Disabled

This site requires JavaScript Enabled to function properly. Please enable JavaScript or use a different browser that has JavaScript enabled.

SA Tenders and Contracts

Display Tender GRFMA025488 
This page displays the details of a tender. See the detailed help in each section for specific information.

A Findings Report for the Gawler River Flood Mitigation Scheme Mark Two.
Issued By Gawler River Floodplain Management Authority
Request for Tender
Tender State
Closed
Tender Code
GRFMA025488
Category
Apparel and Luggage and Personal Care Products

Enquiries 

Contacts

  • Dean Gollan

Description 

The Gawler River Floodplain Management Authority (GRFMA) invites tenders from Tenderers for the provision of a Findings Report for the Gawler River Flood Mitigation Scheme Mark Two.The Gawler River Floodplain Management Authority (GRFMA) invites tenders from Tenderers for the provision of a Findings Report for the Gawler River Flood Mitigation Scheme Mark Two.The Gawler River Floodplain Management Authority (GRFMA) invites tenders from Tenderers for the provision of a Findings Report for the Gawler River Flood Mitigation Scheme Mark Two.

Specification Documents 

You must be logged in to download documents.
  • 20140220 RFT GRFMA Flood Management  
    • Version 2 (20/02/2014)
    • Available by Download
  • 20140220 RFT GRFMA Flood Management Section C Professional Services Agreement  
    • Version 2 (20/02/2014)
    • Available by Download
  • 09041a D127 v3 100ARI DEPTH Gawler Salt A3 10_1of3 110624 1  
    • Version 1 (24/03/2014)
    • Available by Download
  • 09041a D128 v2 100ARI DEPTH Gawler Salt A3 11_2of3 110624  
    • Version 1 (24/03/2014)
    • Available by Download
  • 09041a D130 v2 100ARI DEPTH Gawler Salt A3 12_3of3 110624  
    • Version 1 (24/03/2014)
    • Available by Download
  • 46896a_D301  
    • Version 1 (24/03/2014)
    • Available by Download
  • 46896a_D308  
    • Version 1 (24/03/2014)
    • Available by Download
  • Gawler River Flood Mitigation Scheme Cost Benefit Analysis  
    • Version 1 (24/03/2014)
    • Available by Download
  • RFT Addendum  
    • Version 1 (24/03/2014)
    • Available by Download
  • South Para Works Cost Benefit Report 091211  
    • Version 1 (24/03/2014)
    • Available by Download