Concrete Kerbing 3 year Program
Issued By City of Whyalla
Request for Tender
Tender State
Closed
Tender Code
CCW045622
Contract Number
RFT 2019-002
Category
Concrete curb

Enquiries 

Contacts

Description 

This incorporates the construction, removal and replacement of kerbing at designated locations throughout the city with work to be undertaken in the 2019 -2021 financial years in preparation for the annual road sealing works.

Please download documents attached for complete specification, drawings and probable locations.

Specification Documents 

You must be logged in to download documents.
  • Addendum to Tender 01  
    • Version 1 (06/08/2019)
    • Available by Download
  • Notice to Tenderers NTT02  
    • Version 1 (06/08/2019)
    • Available by Download
  • Notice to Tenderers NTT01  
    • Version 1 (29/07/2019)
    • Available by Download
  • RFT 2010 002 3 year concrete kerbing program final  
    • Version 1 (22/07/2019)
    • Available by Download
  • Appendix 1 Typical Residential Kerb Profiles SD 100 C  
    • Version 1 (19/07/2019)
    • Available by Download
  • Appendix 2 Kerb Ramp Alignment Sketch 6a Plan No 2861  
    • Version 1 (19/07/2019)
    • Available by Download
  • Appendix 3 Kerb Ramp Alignment Sketch 6b Plan No 2861  
    • Version 1 (19/07/2019)
    • Available by Download
  • Appendix 4 Typical Driveway and Invert Details Sketch 9 Plan No 2861 Copy  
    • Version 1 (19/07/2019)
    • Available by Download
  • Appendix 5 Typical Industriall Kerb Profiles SD 105C  
    • Version 1 (19/07/2019)
    • Available by Download
  • Appendix 6 Standard Private Stormwater Outlet Detail Sketch 11 Copy  
    • Version 1 (19/07/2019)
    • Available by Download
  • Appendix 7 Kerb Watertable Installation Abutting Existing Pavement SD 110 C  
    • Version 1 (19/07/2019)
    • Available by Download
  • Appendix 8 Infrastructure - SWI Cocnrete Footpath Construction new logo  
    • Version 1 (19/07/2019)
    • Available by Download
  • Appendix 9 Pre Tender Copy of Risk Assessment  
    • Version 1 (22/07/2019)
    • Available by Download
  • Appendix 10 DRAFT Works Agreement concrete kerbing 3 year program  
    • Version 1 (22/07/2019)
    • Available by Download